Tag: core campus project

Update On The Core Campus Project

Mason construction to continue into the fall semester and beyond BY JACK HARVEY, ASSISTANT NEWS EDITOR Construction around Mason’s Fairfax campus proceeds into the 2019-2020 school year. Students will notice the continued closure of the walkway between Southside and Wilkins…

Why I and Most Other Students Hate Construction

BY OWEN FERGUSON, STAFF WRITER It seems everywhere I go on campus, there is a fence surrounding piles of dirt and rubble. As I try to navigate campus, it feels like a maze. I have to plan out which way is…

Removal Of Water Tower From Fairfax Campus

A Q&A with Mason and Fairfax Water representatives over water tower removal BY  SABIHA BASIT STAFF WRITER As students have noticed, Mason has recently undergone major changes to its Fairfax campus, from demolishing Robinson Hall A to the introduction of…

Core Campus Project Enters New Phase

A sit-down with project manager Cathy Pinskey BY JACK HARVEY, STAFF WRITER Since arriving back for the spring semester, Mason students have no doubt noticed the vast increase of construction around the Fairfax campus. The demolition of Robinson A signals the…

9.17_Student Construction_Christine Viray

Construction and Campus Life

How Mason students feel about construction on campus BY CHRISTINE VIRAY, STAFF WRITER With Mason expanding in order to accommodate new students, there is a lot of construction taking place on campus. Construction teams worked throughout the summer to remodel multiple…